Vietnam’s Ministry of Industry and Trade has proposed another adjustment to Power Development Plan VIII, aimed at reducing the risk of power shortages as electricity demand rises rapidly through 2030 (Vietnam.vn, 24/11/2026). Indeed, electricity consumption could reach 456-544 TWh by 2030, growing by 9.5-13.4%/year, while only around 4% of planned generation projects are currently operational and about 42% have yet to receive investment approval. The country estimates investment requirements for new generation at USD114.5bn over 2026-2030. Overall, across 2026-2050, generation investment increases to USD853.8bn (USD739bn over 2031-2050), in addition to USD 89.2bn for grids (USD20bn over 2026-2030 and USD69bn over 2013-2050).
The proposal envisages 9.4-32.9 GW of onshore/nearshore wind, 28.4-44.5 GW of utility-scale solar, an additional 15.4-18.7 GW of rooftop solar, and 13-25 GW of storage by 2030. In addition, plans include another 3.2 GW of domestic gas-fired generation, 2.7 GW of LNG-fired generation, 300 MW of flexible thermal power, 1.5 GW of hydropower (plus 3-6.3 GW of small hydropower), 0.2-2.3 GW of biomass, 0.3-2.1 GW of waste-to-energy, and electricity imports of 6.5-8.7 GW from Laos and 0.6 GW from China. Nearly 2 GW of coal capacity currently under construction would be completed, while additional coal projects could be accepted if investors can commission them before 2030.
Interested in Global Energy Research?
Enerdata's premium online information service provides up-to-date market reports on 110+ countries. The reports include valuable market data and analysis as well as a daily newsfeed, curated by our energy analysts, on the oil, gas, coal and power markets.
This user-friendly tool gives you the essentials about the domestic markets of your concern, including market structure, organisation, actors, projects and business perspectives.
Energy and Climate Databases
Market Analysis