Skip to main content

TotalEnergies-Eren JV submits 2.7GWp/6GWh solar + BESS project in Australia

A joint venture (JV) between TotalEnergies and Eren Groupe has submitted a 2.7 GW+6 GWh solar-plus-storage project for environmental approval in Australia's Northern Territory (NT).

The Wak Wak Solar park, located southeast of Darwin in the Litchfield Local Government Area, features up to 2.7 GWp of solar PV capacity paired with a 6 GWh battery energy storage system (BESS).

Darwin H2 Project Nominee, acting as trustee for the Darwin H2 Hub Project Trust, is developing the facility on behalf of TE H2, a joint venture dedicated to gigawatt-scale multi-energy projects globally. TotalEnergies holds an 80% stake in the venture, with Eren Groupe holding the remaining 20%.

The project represents the first phase of what is intended to become the region's first solar-powered green hydrogen production and export operation.The solar PV power plant is designed to supply renewable energy to existing industries in the Greater Darwin Region and to power a planned green hydrogen production facility at the Middle Arm Precinct. Meanwhile, the broader Darwin H2 Hub aims to produce more than 80 kt/year of green hydrogen.

Power plant tracker

Interested in Power Plants?

Enerdata has developed a market research service to screen, monitor and analyse the development of power generation assets.

Power Plant Tracker offers an interactive database and a powerful search engine covering power plants worldwide – including both installed and planned capacities for renewables and fossil fuels.

Request a free trial Contact us