Skip to main content

Total invests in Vega Pleyade gas and condensate field in Argentina

Total (operator, 37.5%) has taken the final investment decision to develop the offshore Vega Pleyade gas and condensate field in Tierra de Fuego (Argentina). Vega Pleyade will produce through three horizontal wells. Together with production from the other Total-operated fields in the area, it will allow optimization of supply to the existing treatment plants and continuation of the plateau production of 18 mcm/d (130,000 boe/d).

Vega Pleyade is located offshore Tierra del Fuego in the Cuenca Marina Austral 1 (CMA-1) concession that Total has operated since 1978. The field development plan consists of a wellhead platform in 50 meters of water depth that will be tied in to the Total-operated onshore Rio Cullen and Cañadon Alfa treatment plants by a 77-km pipeline. Separately, Total will also begin offshore drilling in 2014, both to boost production from the Carina field, which started up in 2005, and to appraise the CMA-1 block.



Total invests in Vega Pleyade gas and condensate field in Argentina

Source: Total