Skip to main content

Tema LNG receives FRU for its 1.7 Mt/year LNG import project (Ghana)

Ghana has received a floating regasification unit (FRU), built by Jiangnan Shipbuilding, a subsidiary of China State Shipbuilding Corporation, for its 1.7 Mt/year Tema LNG import terminal project. The Tema terminal, whose construction started in 2018 (construction led by China Habour Engineering Company (CHEC)), includes a floating regasification barge (FRU), floating storage unit, and a pipeline, which will be connected to the domestic grid. The terminal will then be transferred to GNPC and the Ghana Ports and Harbours Authority (GPHA) after the 12-year initial period. The Spanish firm Reganosa Servicios won the contract for the operation and maintenance (O&M) of the FRU, FSU, and the associated 6 km gas pipeline linking the terminal to the existing pipeline network.

World LNG database

Interested in LNG Databases?

World LNG Database offers a complete set of data on LNG markets. The service provides detailed information on existing and planned liquefaction and regasification plants. It also includes LNG shipping around the world, LNG contracts, time series on regasification and liquefaction capacities, LNG flows and LNG prices for all players in the market.

Request a free trial Contact us