Skip to main content

Technip wins 70,000 bbl/d expansion project at Ali Jebel refinery (UAE)

Emirates National Oil Company (ENOC) has awarded Technip to expand its Ali Jebel refinery by 70,000 bbl/d. The main package of the project will add a new condensate processing train to the existing facility, expanding its daily capacity to 210,000 bbl/d, up from its existing current 140,000 bbl/d.



Additional processing units will also be added. These include a new LPG/naphta hydrotreater, an isomerisation unit, kerosene hydrotreater, and a diesel hydrotreater. These units will ensure that the refinery’s fuel products, which include gasoline, jet fuel and diesel, are capable of meeting expanding domestic fuel demand, including strong demand from the aviation sector, as well as for export purposes. The new unit will manufacture products for the local market meeting stringent Euro 5 standards.



The US$1bn project is expected to commence commercial production in autumn 2019.



The Jebel Ali refinery was commissioned in 1999 with a capacity of 120,000 bbl/d and later expanded to 140,000 bbl/d after a debottlenecking project in 2012.

World refinery database

Interested in World Refineries?

Use this powerful business intelligence tool to assess current and future production capacities of oil products by country and by zone. Gain insight into companies' asset portfolios and future trends for refined oil production capacities, giving you the ultimate edge for strategy and decision-making.

Request a free trial Contact us