Skip to main content

India plans to resume UMPP auctions in October 2015

The central government of India plans to resume the auction of Ultra Mega Power Projects (UMPPs) in the next two months and is finalising the proposed UMPPs to be offered. Under the new norms, the proposed UMPPs will have two special purpose vehicles (SPVs), one for the land and coal blocks (leased out to the bidders for 30 years) and the other to own requisite regulatory clearances (transferred to the successful bidders). The Ministry of Coal has deallocated three coal blocks attached with the proposed Bedhabahal UMPP in Odisha, namely Meenakshi, Meenakshi-B and Dipside, that had been awarded to Odisha Integrated Power and that will be transferred to another special purpose vehicle called Odisha Infra Power, attached to the Odisha UMPP.

The Ministry plans to propose five UMPPs, including the Odisha UMPP and the Cheyyur UMPP in Tamil Nadu. So far, the government has identified land in Banka (Bihar), Deogarh (Jharkhand) and Etah (Uttah Pradesh), along with two additional sites in Odisha to develop UMMPs.

Power plant tracker

Interested in Power Plants?

Enerdata has developed a market research service to screen, monitor and analyse the development of power generation assets.

Power Plant Tracker offers an interactive database and a powerful search engine covering power plants worldwide – including both installed and planned capacities for renewables and fossil fuels.

Request a free trial Contact us