Skip to main content

Alinta abandons 900 MW pumped-storage hydropower project in NSW (Australia)

Alinta Energy has decided to discontinue work on the 900 MW Oven Mountain Pumped Hydro Project (OMPS) in New South Wales, Australia (Alinta Energy project website, 22/10/2026). Citing economic and timing challenges on the project and on a critical transmission line, the project was deemed unviable by the company.

The project was designed with eight hours of storage (7.2 GWh), pumping water more than 600 m uphill between reservoirs and releasing it through turbines to generate electricity. Its output could supply over 600,000 homes, and it was intended to replace coal-fired generation in the state and support more renewables on the grid. 

 

Power plant tracker

Interested in Power Plants?

Enerdata has developed a market research service to screen, monitor and analyse the development of power generation assets.

Power Plant Tracker offers an interactive database and a powerful search engine covering power plants worldwide – including both installed and planned capacities for renewables and fossil fuels.

Request a free trial Contact us